sin()
PROVEN

PUBLIC DOCUMENT

PROVEN
IS OPEN.

Proven is the platform behind the lift. People, process and documentation — organized, verified and accountable. Operators, riggers, supervisors, contractors and clients can read how the work is expected to be performed before the gate. No request form. No expiring link. No PDF as the primary experience.

NEED IT NOW

THE SYSTEM

THE METHOD

THE LIFT

WHEN IT GOES WRONG

THE LIBRARY

Read it on a phone at the gate. Print a section if you need it on paper. If the procedure cannot be followed, it is not the procedure.

WHAT THE WORK IS DONE TO

Where these conflict, the stricter applicable requirement wins. Law always wins. The marks name the bodies. They are not an endorsement of sin().

  • CSA Z150 / Z248

    Safety code on mobile cranes. Code for tower cranes.

  • WorkSafeBC

    Occupational Health and Safety Regulation, including Part 14 — Cranes and Hoists.

  • BC Crane Safety

    Crane operator certification and competency requirements in British Columbia.

  • Technical Safety BC

    Applicable technical safety requirements for regulated equipment.

  • ASME B30

    Cranes, derricks, hoists, slings and related lifting equipment.

  • Manufacturer requirements

    Load charts, manuals and configuration limits for the machine on site.

  • Site policies

    The site rules, orientations and lift plans. Where they are stricter, they win.

Proven maps to the COR® elements — the Certificate of Recognition — so that framework is readable. WHAT COR IS →

PROVENsin(). Current version on this site.