This table. This floor. This drawing revision. Not last cycle’s sheet.

DOCUMENT
GOSPEL-SJP-001
REVISION
01 CURRENT
EFFECTIVE
2026-09-01
OWNER
GOSPEL Safety
APPROVED BY
GOSPEL
REVIEW
2027-09-01

FILL GOSPEL-FRM-052 — THIS CYCLE →

WORKSAFEBC — FLYTABLE SAFETY VIDEO →

BC CRANE SAFETY — FLYTABLE LIFT SAFETY →

EFCO E-Z FLY (OEM PAGE) →

DOKA DOKATRUSS TABLE (OEM PAGE) →

ALUMA TRUSS (OEM PAGE) →

Cite. The drawing on this table wins.

User manuals from the manufacturer. Do not copy a hire-yard note as this site’s method.

WHEN

Every flytable / flyform cycle the crane hooks. Critical lift. Fill GOSPEL-FRM-052. Typical tables only — corner and nontypical use GOSPEL-SJP-002 on the same form.

PURPOSE

Name the facts the SWP cannot know until this morning: table ID, drawing revision, weight, pick points, sling lengths, wind number, named crew, holds. The method stays GOSPEL-SWP-028. If this sheet contradicts the SWP, stop and fix one of them before the hook moves.

An SJP is not a longer SWP. It is the SWP plus the facts of this job. Do the work to the method. Fill this instance. If they disagree, stop.

BUILT ON

SWP — FLYTABLE CYCLING — GOSPEL-SWP-028 →

JHA — FLYTABLE CYCLING — GOSPEL-JHA-011 →

SWP — CRITICAL LIFTS — GOSPEL-SWP-019 →

FILL THIS CYCLE — GOSPEL-FRM-052 →

FACTS THIS SHEET MUST NAME

  • Project, building, floor leaving, floor landing
  • Table ID — and whether it is typical
  • Engineered drawing number and revision — matches this table
  • Manufacturer / system (EFCO, Doka, Aluma, other) and the cycle at the lift
  • Weight and centre of gravity (14.36)
  • Every designated pick point, named. Pins / cotters / Safety Pin-Bolts as the OEM
  • Sling type, WLL, and lengths as the drawing — not last floor’s memory. Some systems use a longer rear pair only if that drawing says so
  • Wind limit — the lower of crane, manufacturer, this SJP. A number.
  • Radio channel. Confirmation loop. Who is on drop floor. Who is on landing floor.
  • Curb stops, kicker blocks, brake lines — as the drawing, in place before roll
  • Exclusion below and on the landing floor
  • Named operator, rigger, signalperson, formwork supervisor, prime contact

HOLD POINTS

  1. 01

    BEFORE DROP

    Drawing and OEM cycle at the lift. SJP filled. Meeting done. Radios tested. Zone below. Table free of the pour as the host confirms. Crane not on load.

  2. 02

    BEFORE ROLL PAST THE EDGE

    Curb / kicker / brake line as the drawing. Fall protection at the edge. Exclusion held. Crane will not pull.

  3. 03

    BEFORE THE TABLE LEAVES THE BUILDING

    Every designated pick made. Pins in. People off. Loose material off. Test lift. Hang matches the drawing.

  4. 04

    BEFORE HOIST TO THE NEXT FLOOR

    Landing floor ready on the radio. Confirmation loop. Wind at or below the number. Path clear.

  5. 05

    BEFORE DISCONNECT

    Table on jacks or landing dollies as the OEM. Tiebacks / curbs as the drawing. Formwork supervisor says landed.

ABORT

  • Any fact on this sheet is unknown or no longer true
  • The work is being asked to drift from GOSPEL-SWP-028
  • This table is a corner or nontypical and this is the typical SJP
  • Radio loss. Wind over the number. Person in the zone.
  • Change without stop-and-discuss

NAMED ON THE SHEET

  • Crane operator
  • Rigger
  • Signalperson
  • Formwork supervisor (host)
  • Spotter — drop floor
  • Spotter — landing floor
  • Prime contact
  • Lift supervisor

DOCUMENTATION

  • This SJP / GOSPEL-FRM-052
  • GOSPEL-FRM-007
  • GOSPEL-FRM-009
  • FLHA
  • Drawing revision attached or cited

REFERENCES

  • Workers Compensation Act s. 21 — known or reasonably foreseeable hazards; instruction and supervision
  • OHS Regulation (B.C. Reg. 296/97, in force 15 Apr 1998) Part 3 — OHS program, instruction, inspections
  • OHS Regulation Part 4 s. 4.13 — risk assessment where rescue or evacuation may arise
  • OHS Regulation Part 8 — PPE; headwear CSA Z94.1-05 or Z94.1-15
  • OHS Regulation Part 11 — fall protection
  • OHS Regulation Part 14 — Cranes and Hoists
  • 14.2(5) — CSA Z150-1998, or ASME B30.5-2004, or ASME B30.22-2005 (articulating boom)
  • 14.2(6) — CSA Z248-2004 for tower, hammerhead and self-erecting tower cranes
  • 14.35 pre-use inspection · 14.36 load weight · 14.42.1 critical lift · 14.44 loads over work areas · 14.45 unattended loads · 14.47–14.49 signals
  • OHS Regulation Part 15 — Rigging
  • Manufacturer load chart, manual and configuration limits
  • Site lift plan, FLHA and site rules where stricter
  • WorkSafeBC Flytable Safety (Jul 2025) — drop, roll, fly, land. Critical lift.
  • BC Crane Safety, 14 Aug 2025 — New WorkSafeBC Video: Flytable Lift Safety
  • OHS Regulation Part 20 — formwork and falsework. Host / prime duty. This procedure does not write the cycling carpentry.
  • Manufacturer cycle and shop drawing for this table system — at the lift. Pick points only as the drawing names.