sin()
PROVEN

DAILY FORM

FRM-002

CRANE PRE-USE INSPECTION

Operator inspection for this shift, this machine, this configuration.

DOCUMENT
GOSPEL-FRM-002
REVISION
01 CURRENT
EFFECTIVE
2026-09-01
OWNER
GOSPEL Safety
APPROVED BY
GOSPEL
REVIEW
2027-09-01

FILL THIS FORM — DOWNLOAD PDF →

WHEN

Before the crane comes on load, every shift.

CAPTURE

  • Machine identity and configuration
  • Walkaround and function tests
  • LMI / RCI, brakes, outriggers, wire rope, hooks
  • Defects and out-of-service decision
  • Operator name and time

ROUTING

Operator completes. Defects that affect lifting stop the crane and notify the supervisor and the site.

PROVENsin(). Current version on this site.