DAILY FORM
FRM-002
CRANE PRE-USE INSPECTION
Operator inspection for this shift, this machine, this configuration.
- DOCUMENT
- GOSPEL-FRM-002
- REVISION
- 01 CURRENT
- EFFECTIVE
- 2026-09-01
- OWNER
- GOSPEL Safety
- APPROVED BY
- GOSPEL
- REVIEW
- 2027-09-01
FILL THIS FORM — DOWNLOAD PDF →
WHEN
Before the crane comes on load, every shift.
CAPTURE
- Machine identity and configuration
- Walkaround and function tests
- LMI / RCI, brakes, outriggers, wire rope, hooks
- Defects and out-of-service decision
- Operator name and time
ROUTING
Operator completes. Defects that affect lifting stop the crane and notify the supervisor and the site.
PROVENsin(). Current version on this site.