DAILY FORM
FRM-001
FLHA
Field level hazard assessment for this shift, this lift, this ground.
- DOCUMENT
- GOSPEL-FRM-001
- REVISION
- 01 CURRENT
- EFFECTIVE
- 2026-09-01
- OWNER
- GOSPEL Safety
- APPROVED BY
- GOSPEL
- REVIEW
- 2027-09-01
FILL THIS FORM — DOWNLOAD PDF →
WHEN
Start of shift and whenever the work, weather, crew or zone changes.
CAPTURE
- Site, date, crane, crew names and roles
- Task and load
- Hazards named
- Controls
- Stop criteria
- Signatures of everyone on the lift
ROUTING
Crew completes in the field. Copy to GOSPEL.
PROVENsin(). Current version on this site.