sin

REDTC — RIGGING

READ THE
SLING CHART.

BCACS Crane Core figures, March 2011. 3 sling charts. 30 questions. Training and assessment only — not a manufacturer rating for the lift. Same two-question slot as Fulford LCR practical.

01

OPEN THE PDF

Chain, nylon web, or wire rope. Hitch and angle first, then size.

02

APPLY THE NOTE

2-leg choker × 0.75. Double basket × 2. Do not interpolate.

03

NOT THE JOB

Exam figures. The sling tag and manufacturer chart win in the field.

In the bank

sin. Current version on this site.Work done to CSA Z150 / Z248, WorkSafeBC, BC Crane Safety and the rest — not an endorsement.