SAFE JOB PROCEDURE
LOADING PLATFORM
This deck. This floor. This serial. Empty. Not last floor’s sheet.
- DOCUMENT
- GOSPEL-SJP-003
- REVISION
- 01 CURRENT
- EFFECTIVE
- 2026-09-01
- OWNER
- GOSPEL Safety
- APPROVED BY
- GOSPEL
- REVIEW
- 2027-09-01
FILL GOSPEL-FRM-053 — THIS DECK →
DOKA LOADING PLATFORM (OEM PAGE) →
DOKA LOADING PLATFORM 5.0 t — USER INFORMATION →
DOKA LOADING PLATFORM 3.0 t — USER INFORMATION →
CONQUIP CANTIDECK (OEM PAGE) →
CANTIDECK FIXED FLUSH — USER GUIDE →
CANTIDECK SUPER ROLLER — USER GUIDE →
PERI RCS MP MATERIAL PLATFORM →
3.0 t and 5.0 t. Cite. The user information for this serial wins.
Retractable. Op Fam from Preston. Install is a licensed lift.
Crane-set. Anchors or MULTIPROP — host. User information for this serial.
Powered retractable. Install is a crane lift. Daily extend is host.
WHEN
Every loading-platform install, reposition or strike the crane hooks. Critical lift. Fill GOSPEL-FRM-053. Daily SuperDeck extend / retract is not this sheet.
PURPOSE
Name the facts the SWP cannot know until this morning: manufacturer, serial, dead weight, WLL, pick points, chain, wind number, named crew, holds. The method stays GOSPEL-SWP-030. If this sheet contradicts the SWP, stop and fix one of them before the hook moves.
An SJP is not a longer SWP. It is the SWP plus the facts of this job. Do the work to the method. Fill this instance. If they disagree, stop.
BUILT ON
SWP — LOADING PLATFORM — GOSPEL-SWP-030 →
JHA — LOADING PLATFORM — GOSPEL-JHA-014 →
SWP — CRITICAL LIFTS — GOSPEL-SWP-019 →
FILL THIS DECK — GOSPEL-FRM-053 →
FACTS THIS SHEET MUST NAME
- Project, building, floor leaving, floor landing
- Manufacturer / system — Doka, SuperDeck, CantiDeck, PERI RCS MP, DOC, other
- Serial / ID. Type plate. Fixed or retractable — said
- OEM user information at the lift — document number if it has one
- Dead weight empty, plus rigging (14.36). Not the service WLL
- Service WLL / remaining WLL — named so nobody flies it
- Every designated pick point, named. Four unless this OEM names otherwise
- Chain / sling type, WLL, length. Doka: 4-part 3.20 m, β ≤ 30° if that is this serial
- Wind limit — the lower of crane, manufacturer, this SJP. A number. Doka cites 72 km/h
- Tag lines — how many, who holds them
- Radio channel. Confirmation loop
- Exclusion below and at the slab edge (Part 11, 14.44)
- Who releases props / clamps. Who says landed
HOLD POINTS
- 01
GATE
User information and type plate at the lift. Empty dead weight known. FRM-053 filled. Brief done. If not, the hook does not take the deck.
- 02
HITCH AND EMPTY
Four designated points. Chain as the OEM. People off. Material off. Tag lines on.
- 03
RELEASE
Host has released props / clamps. Confirm free. Then hoist.
- 04
LAND
Host pins rails and props, clamps or anchors as the OEM. Supervisor says landed. Then disconnect.
ABORT
- User information or type plate not at the lift
- Anyone treating service WLL as the fly weight
- People or material on the deck
- Props still in
- Improvised picks
- Wind above the number on this sheet
- Asked to retract or extend a SuperDeck with the crane
- The work is being asked to drift from GOSPEL-SWP-030
NAMED ON THE SHEET
- Operator
- Rigger
- Signalperson
- Tag-line hands
- Platform supervisor (host)
- Prime contact
- Lift supervisor
DOCUMENTATION
- This SJP / GOSPEL-FRM-053
- GOSPEL-FRM-007
- GOSPEL-FRM-009
- FLHA
- OEM user information cited
REFERENCES
- Workers Compensation Act s. 21 — known or reasonably foreseeable hazards; instruction and supervision
- OHS Regulation (B.C. Reg. 296/97, in force 15 Apr 1998) Part 3 — OHS program, instruction, inspections
- OHS Regulation Part 4 s. 4.13 — risk assessment where rescue or evacuation may arise
- OHS Regulation Part 8 — PPE; headwear CSA Z94.1-05 or Z94.1-15
- OHS Regulation Part 11 — fall protection
- OHS Regulation Part 14 — Cranes and Hoists
- 14.2(5) — CSA Z150-1998, or ASME B30.5-2004, or ASME B30.22-2005 (articulating boom)
- 14.2(6) — CSA Z248-2004 for tower, hammerhead and self-erecting tower cranes
- 14.35 pre-use inspection · 14.36 load weight · 14.42.1 critical lift · 14.44 loads over work areas · 14.45 unattended loads · 14.47–14.49 signals
- OHS Regulation Part 15 — Rigging
- Manufacturer load chart, manual and configuration limits
- Site lift plan, FLHA and site rules where stricter
- Doka loading platform User Information — four welded lifting points, Doka 4-part chain 3.20 m, empty only, no persons, sling angle β ≤ 30°, reposition wind 72 km/h, one platform at a time.
- Conquip CantiDeck User Guide — four lifting points, 4-leg chain, tag lines opposite corners, do not lift until props are released, disconnect after screw jacks tight, WLL on the type plate.
- Preston SuperDeck — retractable drawer. Install is a licensed crane lift. Daily extend / retract is host operation. No crane licence to roll it. 604 817 DECK.
- PERI RCS MP material platform — crane-set. Anchors or MULTIPROP between slabs. Host. User information for this serial.
- DOC loading platform — powered retractable drawer. Install / relocate by crane. Daily extend / retract is host, including the 110 V supply.
- 14.36 load weight · 14.44 loads over work areas · 14.47–14.49 signals · Part 11 at the slab edge
- Manufacturer user information for this serial at the lift. Pick points only as the OEM names. Fly weight is empty dead weight plus rigging — not the service WLL.
PROVENsin(). Current version on this site.