INSPECTION FORM
FRM-027FRM-027
TOWER PRE-USE INSPECTION
Topless and hammerhead tower — this shift, this configuration. CSA Z248, 14.35.
- TYPE
- FORM
- DOCUMENT
- PROVEN-FRM-027
- STATUS
- CURRENT
- REVISION
- 01
- EFFECTIVE
- 2026-09-01
- OWNER
- Proven
- APPROVED BY
- Proven
- REVIEW
- 2027-09-01
WHEN
Before the crane comes on load, every shift. MDT 219 and other top-slewing towers.
CAPTURE
- Machine serial, jib, reeving, mast, ballast
- Chart in the cab matches this configuration
- Mast, slew, jib, trolley, hoist rope, hook
- Limits, CCS / overload, anemometer, weathervane
- Access and Cab-IN if fitted
- Defects and out-of-service decision
ROUTING
Operator completes. Defects that affect lifting stop the crane. Copy in the logbook. Copy to Proven.
PROVEN. Current version on this site.