TOWER PRE-USE INSPECTION

Topless and hammerhead tower — this shift, this configuration. CSA Z248, 14.35.

TYPE
FORM
DOCUMENT
PROVEN-FRM-027
STATUS
CURRENT
REVISION
01
EFFECTIVE
2026-09-01
OWNER
Proven
APPROVED BY
Proven
REVIEW
2027-09-01

FILL THIS FORM →

WHEN

Before the crane comes on load, every shift. MDT 219 and other top-slewing towers.

CAPTURE

  • Machine serial, jib, reeving, mast, ballast
  • Chart in the cab matches this configuration
  • Mast, slew, jib, trolley, hoist rope, hook
  • Limits, CCS / overload, anemometer, weathervane
  • Access and Cab-IN if fitted
  • Defects and out-of-service decision

ROUTING

Operator completes. Defects that affect lifting stop the crane. Copy in the logbook. Copy to Proven.