SAFE WORK PROCEDURE
CRANE PRE-USE INSPECTION
Each shift, this machine, this configuration.
- DOCUMENT
- GOSPEL-SWP-002
- REVISION
- 01 CURRENT
- EFFECTIVE
- 2026-09-01
- OWNER
- GOSPEL Safety
- APPROVED BY
- GOSPEL
- REVIEW
- 2027-09-01
PURPOSE
Find defects that affect lifting before the crane comes on load.
SCOPE
Every operator, every shift, on the crane they will run. Done as the manufacturer, the named 14.2 standard, and Part 14 require.
This document is the method — the steps. Hazards, consequence and residual risk for the same work are in the JHA library. A procedure is not a hazard analysis. A hazard analysis is not a procedure.
PROCEDURE
- 01
IDENTITY
This is the crane on this lift. Configuration matches the chart you will use.
- 02
WALKAROUND
Structure, welds, pins, tires or tracks, outriggers, leaks, rope, hook and latch, sheaves.
- 03
CAB AND SAFETY DEVICES
LMI / RCI, anti-two-block, horns, windows, fire extinguisher, load chart in the cab.
- 04
FUNCTION
Hoist, boom, swing, travel, brakes, outrigger controls — through the range you will use, without a load.
- 05
RECORD
Complete the inspection record. Defects that affect lifting: crane down, supervisor and the employer at the workplace told.
- 06
DO NOT START
If a safety device is bypassed or inoperative, the crane does not lift.
RESPONSIBILITIES
This program
The published method for the work. Stop-work is named in it. It does not own the site.
Supervisor
Confirms the plan, the crew, the zone and the stop criteria. Owns whether the hook moves.
Crane operator
Runs only the machine they are competent on, to the chart, after inspection. Stops on an unclear signal or a broken plan.
Rigger
Selects, inspects and applies the hitch. Does not guess weight, centre of gravity or angle.
Signalperson
One set of hands on the crane. Holds the zone. STOP means stop.
Worker
Works to this program and to site rules — whichever is stricter. Uses the three rights. Reports damaged gear.
REQUIRED COMPETENCY
- Operator for this class
- Knows this machine’s inspection points
EQUIPMENT
- Manufacturer inspection list
- This SWP
- Inspection form GOSPEL-FRM-002
PPE
- Hard hat
- CSA-grade footwear
- High-visibility clothing
- Eye protection
- Task-rated gloves
- Hearing protection where required
- Fall protection where the work exposes a fall
PROHIBITED PRACTICES
- Signing an inspection you did not do
- Bypassing LMI / RCI or anti-two-block to “get the day going”
- Lifting with a known lifting defect
EMERGENCY RESPONSE
Stop the lift. Make people safe. Land or hold the load if it can be done without a second incident. First aid. Notify the site and the employer. Hold the scene.
DOCUMENTATION
- GOSPEL-FRM-002
- Machine log if the site requires it
REFERENCES
- Workers Compensation Act s. 21 — known or reasonably foreseeable hazards; instruction and supervision
- OHS Regulation (B.C. Reg. 296/97, in force 15 Apr 1998) Part 3 — OHS program, instruction, inspections
- OHS Regulation Part 4 s. 4.13 — risk assessment where rescue or evacuation may arise
- OHS Regulation Part 8 — PPE; headwear CSA Z94.1-05 or Z94.1-15
- OHS Regulation Part 11 — fall protection
- OHS Regulation Part 14 — Cranes and Hoists
- 14.2(5) — CSA Z150-1998, or ASME B30.5-2004, or ASME B30.22-2005 (articulating boom)
- 14.2(6) — CSA Z248-2004 for tower, hammerhead and self-erecting tower cranes
- 14.35 pre-use inspection · 14.36 load weight · 14.42.1 critical lift · 14.44 loads over work areas · 14.45 unattended loads · 14.47–14.49 signals
- OHS Regulation Part 15 — Rigging
- Manufacturer load chart, manual and configuration limits
- Site lift plan, FLHA and site rules where stricter