sin()
PROVEN

SAFE WORK PROCEDURE

SWP-027

TOWER ERECTION, CLIMBING AND DISMANTLING

Not a routine operator shift. Qualified supervisor. Notice of Project. 14.73.2.

DOCUMENT
GOSPEL-SWP-027
REVISION
01 CURRENT
EFFECTIVE
2026-09-01
OWNER
GOSPEL Safety
APPROVED BY
GOSPEL
REVIEW
2027-09-01

PURPOSE

Stop treating jumping a tower like running a shift. If this is the work, it is planned as this work.

SCOPE

Tower-crane erection, climbing (increasing height), repositioning and dismantling. Not climbing the ladder to the cab to operate. Not a how-to for jumping a crane.

This document is the method — the steps. Hazards, consequence and residual risk for the same work are in the JHA library. A procedure is not a hazard analysis. A hazard analysis is not a procedure.

PROCEDURE

  1. 01

    CONFIRM THE WORK

    The work is erection, climbing or dismantling — said in writing. A tower operator shift is not this work.

  2. 02

    SUPERVISOR AND NOP

    Qualified supervisor named. Notice of Project to WorkSafeBC on the timeline 14.73.3 names. If either is missing, the work does not start.

  3. 03

    MANUAL AND CONFIGURATION

    This serial, this tower system, this climbing frame, this tie-in. The manufacturer’s sequence is the sequence.

  4. 04

    ZONE AND WEATHER

    Exclusion under the work. Wind and weather as the manufacturer and the plan. People off the ground under the frame.

  5. 05

    ISOLATE WHEN REQUIRED

    Lockout / isolation when anyone is in the machine for this work. GOSPEL-SWP-026.

  6. 06

    STOP

    Any step that is not in the manual, any missing pin, any unplanned person in the zone — stop. Rewrite. Do not improvise a jump.

RESPONSIBILITIES

This program

The published method for the work. Stop-work is named in it. It does not own the site.

Supervisor

Confirms the plan, the crew, the zone and the stop criteria. Owns whether the hook moves.

Crane operator

Runs only the machine they are competent on, to the chart, after inspection. Stops on an unclear signal or a broken plan.

Rigger

Selects, inspects and applies the hitch. Does not guess weight, centre of gravity or angle.

Signalperson

One set of hands on the crane. Holds the zone. STOP means stop.

Worker

Works to this program and to site rules — whichever is stricter. Uses the three rights. Reports damaged gear.

REQUIRED COMPETENCY

  • Work under a qualified supervisor as 14.73.2 and 14.73.3 require. A tower ticket alone does not assign an operator to jump a crane.

EQUIPMENT

  • This crane’s erection / climbing manual
  • The climbing frame for this serial
  • GOSPEL-SWP-026

PPE

  • Hard hat
  • CSA-grade footwear
  • High-visibility clothing
  • Eye protection
  • Task-rated gloves
  • Hearing protection where required
  • Fall protection where the work exposes a fall

PROHIBITED PRACTICES

  • An operator jumping a crane as a favour
  • Skipping the NOP because the pour is tomorrow
  • Using a different manufacturer’s climbing notes

EMERGENCY RESPONSE

Stop the lift. Make people safe. Land or hold the load if it can be done without a second incident. First aid. Notify the site and the employer. Hold the scene.

DOCUMENTATION

  • NOP-TC
  • Site binder checklist
  • Qualified supervisor named
  • Manufacturer erection / climbing procedure for this serial

REFERENCES

  • Workers Compensation Act s. 21 — known or reasonably foreseeable hazards; instruction and supervision
  • OHS Regulation (B.C. Reg. 296/97, in force 15 Apr 1998) Part 3 — OHS program, instruction, inspections
  • OHS Regulation Part 4 s. 4.13 — risk assessment where rescue or evacuation may arise
  • OHS Regulation Part 8 — PPE; headwear CSA Z94.1-05 or Z94.1-15
  • OHS Regulation Part 11 — fall protection
  • OHS Regulation Part 14 — Cranes and Hoists
  • 14.2(5) — CSA Z150-1998, or ASME B30.5-2004, or ASME B30.22-2005 (articulating boom)
  • 14.2(6) — CSA Z248-2004 for tower, hammerhead and self-erecting tower cranes
  • 14.35 pre-use inspection · 14.36 load weight · 14.42.1 critical lift · 14.44 loads over work areas · 14.45 unattended loads · 14.47–14.49 signals
  • OHS Regulation Part 15 — Rigging
  • Manufacturer load chart, manual and configuration limits
  • Site lift plan, FLHA and site rules where stricter

PROVENsin(). Current version on this site.