SAFE WORK PROCEDURE
SHACKLES
The right shackle, the right pin, the right way around.
- DOCUMENT
- GOSPEL-SWP-012
- REVISION
- 01 CURRENT
- EFFECTIVE
- 2026-09-01
- OWNER
- GOSPEL Safety
- APPROVED BY
- GOSPEL
- REVIEW
- 2027-09-01
PURPOSE
Use shackles within WLL, with the pin that belongs to them, in the orientation they were made for.
SCOPE
Anchor, chain and other shackles used in rigging under this program.
This document is the method — the steps. Hazards, consequence and residual risk for the same work are in the JHA library. A procedure is not a hazard analysis. A hazard analysis is not a procedure.
PROCEDURE
- 01
IDENTIFY
Type, WLL, pin that belongs to this body.
- 02
INSPECT
Wear, stretch, bent pin, opened jaw — out of service.
- 03
ORIENT
Load the bow and pin as designed. Do not side-load unless the manufacturer allows it.
- 04
PIN
Fully engaged. Screw pins moused where required. No truck-bolt specials.
- 05
AFTER THE LIFT
Inspect again. A pinched shackle is a failed shackle.
RESPONSIBILITIES
This program
The published method for the work. Stop-work is named in it. It does not own the site.
Supervisor
Confirms the plan, the crew, the zone and the stop criteria. Owns whether the hook moves.
Crane operator
Runs only the machine they are competent on, to the chart, after inspection. Stops on an unclear signal or a broken plan.
Rigger
Selects, inspects and applies the hitch. Does not guess weight, centre of gravity or angle.
Signalperson
One set of hands on the crane. Holds the zone. STOP means stop.
Worker
Works to this program and to site rules — whichever is stricter. Uses the three rights. Reports damaged gear.
REQUIRED COMPETENCY
- Can identify type and WLL
- Knows bow versus pin loading
EQUIPMENT
- Identified shackles
- Correct pins
PPE
- Hard hat
- CSA-grade footwear
- High-visibility clothing
- Eye protection
- Task-rated gloves
- Hearing protection where required
- Fall protection where the work exposes a fall
PROHIBITED PRACTICES
- Mixing pins between shackles
- Using a shackle as a hook by hanging it on an edge
- Welding on a shackle
EMERGENCY RESPONSE
Stop the lift. Make people safe. Land or hold the load if it can be done without a second incident. First aid. Notify the site and the employer. Hold the scene.
DOCUMENTATION
- FLHA
- Pre-use / inspection record
- This SWP number and revision
REFERENCES
- Workers Compensation Act s. 21 — known or reasonably foreseeable hazards; instruction and supervision
- OHS Regulation (B.C. Reg. 296/97, in force 15 Apr 1998) Part 3 — OHS program, instruction, inspections
- OHS Regulation Part 4 s. 4.13 — risk assessment where rescue or evacuation may arise
- OHS Regulation Part 8 — PPE; headwear CSA Z94.1-05 or Z94.1-15
- OHS Regulation Part 11 — fall protection
- OHS Regulation Part 14 — Cranes and Hoists
- 14.2(5) — CSA Z150-1998, or ASME B30.5-2004, or ASME B30.22-2005 (articulating boom)
- 14.2(6) — CSA Z248-2004 for tower, hammerhead and self-erecting tower cranes
- 14.35 pre-use inspection · 14.36 load weight · 14.42.1 critical lift · 14.44 loads over work areas · 14.45 unattended loads · 14.47–14.49 signals
- OHS Regulation Part 15 — Rigging
- Manufacturer load chart, manual and configuration limits
- Site lift plan, FLHA and site rules where stricter
PROVENsin(). Current version on this site.