SAFE WORK PROCEDURE
HOOKS
Latch works. Throat not opened. Tip not loaded.
- DOCUMENT
- GOSPEL-SWP-013
- REVISION
- 01 CURRENT
- EFFECTIVE
- 2026-09-01
- OWNER
- GOSPEL Safety
- APPROVED BY
- GOSPEL
- REVIEW
- 2027-09-01
PURPOSE
Keep hooks in service only when they can hold the hitch they are asked to hold.
SCOPE
Crane hooks and rigging hooks the crew uses.
This document is the method — the steps. Hazards, consequence and residual risk for the same work are in the JHA library. A procedure is not a hazard analysis. A hazard analysis is not a procedure.
PROCEDURE
- 01
INSPECT
Latch function, wear in the saddle, throat opening, cracks, swivel.
- 02
SEAT
Sling or fitting in the saddle. Not on the tip. Not on the latch.
- 03
LATCH
If the latch is gone, the hook is out of service unless the hitch does not require it and the manufacturer allows it. Default is out of service.
- 04
MULTI-LEG
Use a shackle or master link. Do not stack legs so they walk off the hook.
RESPONSIBILITIES
This program
The published method for the work. Stop-work is named in it. It does not own the site.
Supervisor
Confirms the plan, the crew, the zone and the stop criteria. Owns whether the hook moves.
Crane operator
Runs only the machine they are competent on, to the chart, after inspection. Stops on an unclear signal or a broken plan.
Rigger
Selects, inspects and applies the hitch. Does not guess weight, centre of gravity or angle.
Signalperson
One set of hands on the crane. Holds the zone. STOP means stop.
Worker
Works to this program and to site rules — whichever is stricter. Uses the three rights. Reports damaged gear.
REQUIRED COMPETENCY
- Knows rejection for opening, wear and latch
EQUIPMENT
- The hook on the crane or in the hitch
- Latch
PPE
- Hard hat
- CSA-grade footwear
- High-visibility clothing
- Eye protection
- Task-rated gloves
- Hearing protection where required
- Fall protection where the work exposes a fall
PROHIBITED PRACTICES
- Wiring a latch shut
- Mousing as a substitute for a missing latch on a crane hook
- Shock loading a hook to “seat” it
EMERGENCY RESPONSE
Stop the lift. Make people safe. Land or hold the load if it can be done without a second incident. First aid. Notify the site and the employer. Hold the scene.
DOCUMENTATION
- FLHA
- Pre-use / inspection record
- This SWP number and revision
REFERENCES
- Workers Compensation Act s. 21 — known or reasonably foreseeable hazards; instruction and supervision
- OHS Regulation (B.C. Reg. 296/97, in force 15 Apr 1998) Part 3 — OHS program, instruction, inspections
- OHS Regulation Part 4 s. 4.13 — risk assessment where rescue or evacuation may arise
- OHS Regulation Part 8 — PPE; headwear CSA Z94.1-05 or Z94.1-15
- OHS Regulation Part 11 — fall protection
- OHS Regulation Part 14 — Cranes and Hoists
- 14.2(5) — CSA Z150-1998, or ASME B30.5-2004, or ASME B30.22-2005 (articulating boom)
- 14.2(6) — CSA Z248-2004 for tower, hammerhead and self-erecting tower cranes
- 14.35 pre-use inspection · 14.36 load weight · 14.42.1 critical lift · 14.44 loads over work areas · 14.45 unattended loads · 14.47–14.49 signals
- OHS Regulation Part 15 — Rigging
- Manufacturer load chart, manual and configuration limits
- Site lift plan, FLHA and site rules where stricter