OH&S POLICY
POL-011
CRANE OPERATIONS
The chart is the law of the machine. No lift without a plan. No unclear signal.
- DOCUMENT
- GOSPEL-POL-011
- REVISION
- 01 CURRENT
- EFFECTIVE
- 2026-09-01
- OWNER
- GOSPEL Safety
- APPROVED BY
- GOSPEL
- REVIEW
- 2027-09-01
Chart and configuration
Operators run the crane they will operate, in the configuration the chart requires. Counterweight, boom, jib, software — as written.
Ground and setup
Outriggers, mats, level, and supporting surface as the manufacturer and the plan require. Scrap lumber is not engineering.
Stop
Unclear signal, unknown load, wind out of plan, lines inside MAD — the crane does not come on load.
PROVENsin(). Current version on this site.