sin()
PROVEN

OH&S POLICY

POL-011

CRANE OPERATIONS

The chart is the law of the machine. No lift without a plan. No unclear signal.

DOCUMENT
GOSPEL-POL-011
REVISION
01 CURRENT
EFFECTIVE
2026-09-01
OWNER
GOSPEL Safety
APPROVED BY
GOSPEL
REVIEW
2027-09-01

Chart and configuration

Operators run the crane they will operate, in the configuration the chart requires. Counterweight, boom, jib, software — as written.

Ground and setup

Outriggers, mats, level, and supporting surface as the manufacturer and the plan require. Scrap lumber is not engineering.

Stop

Unclear signal, unknown load, wind out of plan, lines inside MAD — the crane does not come on load.

PROVENsin(). Current version on this site.