JOB HAZARD ANALYSIS
MOBILE CRANE SETUP
Punch-through, short-rig, tail swing, overhead lines, wrong chart.
- DOCUMENT
- GOSPEL-JHA-006
- REVISION
- 01 CURRENT
- EFFECTIVE
- 2026-09-01
- OWNER
- GOSPEL Safety
- APPROVED BY
- GOSPEL
- REVIEW
- 2027-09-01
THE JOB
Putting a mobile crane or boom truck on the ground the chart requires. Method: GOSPEL-SWP-001, 021, 022. 14.2(5) CSA Z150-1998 or ASME B30.5-2004 or B30.22-2005.
WHO IS EXPOSED
- Operator
- Oiler / second
- People in the jack line or tail-swing arc
- Anyone under a boom being raised into lines
A JHA names what can hurt someone and how that risk is controlled. It is not the procedure. Do the work to the matching SWP. WorkSafeBC does not prescribe a JHA form — the Workers Compensation Act s. 21(2)(b) requires workers to be made aware of known or reasonably foreseeable hazards. This is how GOSPEL does that for this job.
HAZARDS AND RISK
Task is the work being analysed — not a procedure to follow. Controls follow the hierarchy: eliminate, substitute, engineer, administer, PPE last. The badge is how bad this task going wrong is in this job. Extreme is the killer with no recovery. High is serious injury or a dropped load you still have a chance to stop. Moderate is lost time or a plan that failed. Low is first aid.
LOWMODERATEHIGHEXTREME
| TASK | HAZARD | RISK | CONTROL |
|---|---|---|---|
| Confirm the machine | Counterweight, boom, software or tyres not as assigned | HIGHChart does not apply. Overload without an alarm that matches reality. 14.2, 14.12. | Serial, configuration and chart are the same machine. Manufacturer instructions in the cab. |
| Walk the pad | Backfill, vaults, slope, buried services, other cranes | EXTREMEPunch-through, overturn, contact with a main. High severity. | Look and ask. Locates. Engineer when the surface is a guess. Mats spread load — they do not invent bearing. |
| Outriggers and mats | Short-rig without that chart; undersized cribbing; people in the jack line | EXTREMEOverturn. Crush beside a jack. 14.2 to the manufacturer. | Fully extended unless the short-rig chart is in the cab and in use. People clear while jacking. Level within manufacturer limit. |
| Swing and lines | Tail swing, boom into plant, overhead electrical | EXTREMEStruck-by, arc, step potential. 14.40, 14.52.1. | Swing check before the hook. MAD as a wall. Spotter when the boom can encroach. |
| Inspect, then lift | Defect that affects lifting, skipped pre-use | MODERATEFunction failure on the first pick. 14.35. | Pre-use this shift, this configuration. Lifting defects: crane down. |
RESIDUAL RISK
Ground that looked competent can still give on the first load. Residual is settlement and a crane that is no longer the crane on the chart. Held by mats sized for the reaction, a level check, and treating the first load as a test of the pad. 14.11 support structure. 14.35 pre-use.
THE JOB DOES NOT PROCEED IF
- Wrong configuration for the chart in the cab
- Ground will not hold the reaction
- Outriggers not in the charted position
- Overhead lines inside MAD
PPE — LAST LINE
- Hard hat
- CSA-grade footwear
- High-visibility clothing
- Eye protection
- Task-rated gloves
- Hearing protection where required
- Fall protection where the work exposes a fall
REFERENCES
- Workers Compensation Act s. 21(2)(b) — workers made aware of known or reasonably foreseeable hazards
- Workers Compensation Act s. 21(2)(e) — information, instruction, training and supervision
- OHS Regulation B.C. Reg. 296/97 (in force 15 Apr 1998) Part 3 — program, instruction, inspections (ss. 3.1–3.12)
- CCOHS Job Safety Analysis — JSA and JHA are the same method: break the job, name the hazards, select controls
- Workers Compensation Act s. 21 — known or reasonably foreseeable hazards; instruction and supervision
- OHS Regulation (B.C. Reg. 296/97, in force 15 Apr 1998) Part 3 — OHS program, instruction, inspections
- OHS Regulation Part 4 s. 4.13 — risk assessment where rescue or evacuation may arise
- OHS Regulation Part 8 — PPE; headwear CSA Z94.1-05 or Z94.1-15
- OHS Regulation Part 11 — fall protection
- OHS Regulation Part 14 — Cranes and Hoists
- 14.2(5) — CSA Z150-1998, or ASME B30.5-2004, or ASME B30.22-2005 (articulating boom)
- 14.2(6) — CSA Z248-2004 for tower, hammerhead and self-erecting tower cranes
- 14.35 pre-use inspection · 14.36 load weight · 14.42.1 critical lift · 14.44 loads over work areas · 14.45 unattended loads · 14.47–14.49 signals
- OHS Regulation Part 15 — Rigging
- Manufacturer load chart, manual and configuration limits
- Site lift plan, FLHA and site rules where stricter