THE JOB
A lift the site or this program calls critical. Method: GOSPEL-SWP-019. 14.42 tandem. 14.42.1 critical lift.
WHO IS EXPOSED
- Named supervisor
- Operator
- Rigger and signalperson
- People under the path — plant operators, public, other trades
A JHA names what can hurt someone and how that risk is controlled. It is not the procedure. Do the work to the matching SWP. WorkSafeBC does not prescribe a JHA form — the Workers Compensation Act s. 21(2)(b) requires workers to be made aware of known or reasonably foreseeable hazards. This is how GOSPEL does that for this job.
HAZARDS AND RISK
Task is the work being analysed — not a procedure to follow. Controls follow the hierarchy: eliminate, substitute, engineer, administer, PPE last. The badge is how bad this task going wrong is in this job. Extreme is the killer with no recovery. High is serious injury or a dropped load you still have a chance to stop. Moderate is lost time or a plan that failed. Low is first aid.
LOWMODERATEHIGHEXTREME
| TASK | HAZARD | RISK | CONTROL |
|---|---|---|---|
| Declare why it is critical | Calling it routine when it is capacity, tandem, public or shifting COG | HIGHControls that belong to a grocery pick. Multiple fatalities or plant loss. | Say it out loud. Write it. 14.42.1. If it meets the definition, it is critical. |
| Plan and people | Implied roles, missing engineer, plan left in the office | HIGHNobody owns the abort. Tandem mismatch. 14.42. | Plan at the lift. Named operator, rigger, signal, supervisor. Engineer when required. |
| Brief | Signatures without understanding | MODERATECrew cannot stop what they cannot name. | Everyone repeats the plan, the signals, who stops it. If they cannot, the brief failed. Act s. 21(2)(e). |
| Hold points | Skipping a hold to keep the crane moving | HIGHThe condition you were going to check is the one that fails. | Holds are the control. Abort is a success. Rewrite — do not improvise. |
RESIDUAL RISK
A written plan still fails when a hold point is skipped because the crane is waiting. Residual is overconfidence. Held by named people who can repeat the abort, and by stopping when a condition is unmet — not by adapting on the fly. 14.42.1.
THE JOB DOES NOT PROCEED IF
- No written critical lift plan at the lift
- No named supervisor
- Anyone on the crew cannot repeat the abort
- Tandem without a single lead and a plan (14.42)
PPE — LAST LINE
- Hard hat
- CSA-grade footwear
- High-visibility clothing
- Eye protection
- Task-rated gloves
- Hearing protection where required
- Fall protection where the work exposes a fall
REFERENCES
- Workers Compensation Act s. 21(2)(b) — workers made aware of known or reasonably foreseeable hazards
- Workers Compensation Act s. 21(2)(e) — information, instruction, training and supervision
- OHS Regulation B.C. Reg. 296/97 (in force 15 Apr 1998) Part 3 — program, instruction, inspections (ss. 3.1–3.12)
- CCOHS Job Safety Analysis — JSA and JHA are the same method: break the job, name the hazards, select controls
- Workers Compensation Act s. 21 — known or reasonably foreseeable hazards; instruction and supervision
- OHS Regulation (B.C. Reg. 296/97, in force 15 Apr 1998) Part 3 — OHS program, instruction, inspections
- OHS Regulation Part 4 s. 4.13 — risk assessment where rescue or evacuation may arise
- OHS Regulation Part 8 — PPE; headwear CSA Z94.1-05 or Z94.1-15
- OHS Regulation Part 11 — fall protection
- OHS Regulation Part 14 — Cranes and Hoists
- 14.2(5) — CSA Z150-1998, or ASME B30.5-2004, or ASME B30.22-2005 (articulating boom)
- 14.2(6) — CSA Z248-2004 for tower, hammerhead and self-erecting tower cranes
- 14.35 pre-use inspection · 14.36 load weight · 14.42.1 critical lift · 14.44 loads over work areas · 14.45 unattended loads · 14.47–14.49 signals
- OHS Regulation Part 15 — Rigging
- Manufacturer load chart, manual and configuration limits
- Site lift plan, FLHA and site rules where stricter