TOWER CRANE REPORT

Qualified supervisor’s report after erect, climb or reposition. Companion to the WorkSafeBC checklist.

TYPE
FORM
DOCUMENT
PROVEN-FRM-041
STATUS
CURRENT
REVISION
01
EFFECTIVE
2026-09-01
OWNER
Proven
APPROVED BY
Proven
REVIEW
2027-09-01

FILL THIS FORM →

WORKSAFEBC TOWER CRANE REPORT →

WHEN

After the crane is erected, climbed or repositioned. Before it goes back on load.

CAPTURE

  • Site, date, activity
  • Crane serial and configuration as standing
  • Qualified supervisor
  • Foundation / pads / ties as left
  • Limits, overload, anemometer, weathervane tested
  • Aviation lights / marking if required
  • Deficiencies and out-of-service items
  • Release to operate — yes / no

ROUTING

Activity supervisor. Keep at the workplace. WorkSafeBC’s checklist is the official format — complete that as well and file both.