INSPECTION FORM
FRM-029
SELF-ERECT INSPECTION
Hup, Igo and Igo T. Unfold complete, ballast locked, chart for this jib position.
- DOCUMENT
- GOSPEL-FRM-029
- REVISION
- 01 CURRENT
- EFFECTIVE
- 2026-09-01
- OWNER
- GOSPEL Safety
- APPROVED BY
- GOSPEL
- REVIEW
- 2027-09-01
WHEN
After unfold, and before the crane comes on load each shift while erected.
CAPTURE
- Machine serial, jib position, ballast
- Outriggers, pads, slope
- Unfold complete — pins in, transport locks off
- Remote / cab, limits, hoist, power
- Weathervane / out-of-service
- Defects and out-of-service decision
ROUTING
Operator completes. Incomplete unfold or missing ballast stops the crane. Copy in the logbook. Copy to GOSPEL.
PROVENsin(). Current version on this site.