INSPECTION FORM
FRM-029FRM-029
SELF-ERECT INSPECTION
Hup, Igo and Igo T. Unfold complete, ballast locked, chart for this jib position.
- TYPE
- FORM
- DOCUMENT
- PROVEN-FRM-029
- STATUS
- CURRENT
- REVISION
- 01
- EFFECTIVE
- 2026-09-01
- OWNER
- Proven
- APPROVED BY
- Proven
- REVIEW
- 2027-09-01
WHEN
After unfold, and before the crane comes on load each shift while erected.
CAPTURE
- Machine serial, jib position, ballast
- Outriggers, pads, slope
- Unfold complete — pins in, transport locks off
- Remote / cab, limits, hoist, power
- Weathervane / out-of-service
- Defects and out-of-service decision
ROUTING
Operator completes. Incomplete unfold or missing ballast stops the crane. Copy in the logbook. Copy to Proven.