sin()
PROVEN

INSPECTION FORM

FRM-022

RIGGING EQUIPMENT INSPECTION

Periodic check of the program or site gear the crew will pick up.

DOCUMENT
GOSPEL-FRM-022
REVISION
01 CURRENT
EFFECTIVE
2026-09-01
OWNER
GOSPEL Safety
APPROVED BY
GOSPEL
REVIEW
2027-09-01

FILL THIS FORM — DOWNLOAD PDF →

WHEN

Before a long job and on a recorded interval for gear used on the lift.

CAPTURE

  • Inventory
  • Condition
  • Removed from service
  • Inspector

ROUTING

GOSPEL. Failed gear does not travel to the next site.

PROVENsin(). Current version on this site.