sin

DAILY FORM

FRM-024
FRM-024

RIGGER LOG

Gear used, lifts made, what was isolated. Before the hitch takes load.

TYPE
FORM
DOCUMENT
PROVEN-FRM-024
STATUS
CURRENT
REVISION
01
EFFECTIVE
2026-09-01
OWNER
Proven
APPROVED BY
Proven
REVIEW
2027-09-01

FILL THIS FORM — DOWNLOAD PDF →

WHEN

Each shift the rigger is on the lift.

CAPTURE

  • Site, date, rigger
  • Load and hitch
  • Slings and hardware identified
  • Pre-use of gear (pass / fail / isolated)
  • Lifts this shift
  • Rejected gear tagged

ROUTING

Rigger completes. Failed gear is isolated the same hour. Copy to Proven.

PROVEN. Current version on this site.