sin()
PROVEN

BINDER FORM

FRM-046

POWER SOURCE RECORD

How the crane is fed, who can isolate it, where the earth is.

DOCUMENT
GOSPEL-FRM-046
REVISION
01 CURRENT
EFFECTIVE
2026-09-01
OWNER
GOSPEL Safety
APPROVED BY
GOSPEL
REVIEW
2027-09-01

FILL THIS FORM →

WHEN

Before first power-up on this site. After any change to the feed.

CAPTURE

  • Supply (generator / site / utility)
  • Voltage, phases, protection
  • Isolation point and lockout
  • Earthing
  • Who is allowed to make it live
  • Who holds the keys

ROUTING

Activity supervisor and the person who made the connection. Copy in the binder. Lockout: SWP-026.

PROVENsin(). Current version on this site.