sin()
PROVEN

INSPECTION FORM

FRM-028

LUFFING JIB INSPECTION

MRH hydraulic luffer and MR rope luffer. Jib angle, luffing system, weathervane.

DOCUMENT
GOSPEL-FRM-028
REVISION
01 CURRENT
EFFECTIVE
2026-09-01
OWNER
GOSPEL Safety
APPROVED BY
GOSPEL
REVIEW
2027-09-01

FILL THIS FORM →

WHEN

Before the crane comes on load, every shift on a luffing-jib tower. After any luffing-system work.

CAPTURE

  • Machine serial and whether hydraulic (MRH) or rope (MR)
  • Jib length, angle, reeving, ballast — chart in the cab
  • Hydraulic rams, hoses, tank — or luffing rope, cathead, winch
  • Hoist, slew, limits, anemometer
  • Out-of-service jib position for this wind
  • Defects and out-of-service decision

ROUTING

Operator completes. Luffing-system defects stop the crane. Copy in the logbook. Copy to GOSPEL.

PROVENsin(). Current version on this site.