sin()
PROVEN

DAILY FORM

FRM-005

DAILY LIFT CHECKLIST

The last pass before the hook: plan, gear, zone, people.

DOCUMENT
GOSPEL-FRM-005
REVISION
01 CURRENT
EFFECTIVE
2026-09-01
OWNER
GOSPEL Safety
APPROVED BY
GOSPEL
REVIEW
2027-09-01

WHEN

Before the first load of the shift and before each non-routine lift.

CAPTURE

  • Load data confirmed
  • Chart and configuration
  • Rigging inspected
  • Zone held
  • Communication tested
  • Go / no-go

ROUTING

Operator and rigger initial. Supervisor holds the sheet.

PROVENsin(). Current version on this site.