LIFTING FORM
FRM-007
CRITICAL LIFT PLAN
Named supervision, slower brief, hard limits. Ego is not a control.
- DOCUMENT
- GOSPEL-FRM-007
- REVISION
- 01 CURRENT
- EFFECTIVE
- 2026-09-01
- OWNER
- GOSPEL Safety
- APPROVED BY
- GOSPEL
- REVIEW
- 2027-09-01
FILL THIS FORM — DOWNLOAD PDF →
WHEN
Loads approaching chart, tandem lifts, lifts over plant or public, shifting COG, or as the site defines.
CAPTURE
- Why it is critical
- Engineer involvement if required
- Step-by-step sequence
- Hold points
- Rescue / abort
- Approvals
ROUTING
Approved before the hook is loaded. Copy to GOSPEL and the prime contractor as required.