CRITICAL LIFT PLAN

Named supervision, slower brief, hard limits. Ego is not a control.

TYPE
FORM
DOCUMENT
PROVEN-FRM-007
STATUS
CURRENT
REVISION
01
EFFECTIVE
2026-09-01
OWNER
Proven
APPROVED BY
Proven
REVIEW
2027-09-01

FILL THIS FORM — DOWNLOAD PDF →

WHEN

Loads approaching chart, tandem lifts, lifts over plant or public, shifting COG, or as the site defines.

CAPTURE

  • Why it is critical
  • Engineer involvement if required
  • Step-by-step sequence
  • Hold points
  • Rescue / abort
  • Approvals

ROUTING

Approved before the hook is loaded. Copy to Proven and the prime contractor as required.

PROVEN. Current version on this site.