OPEN THE PDF
Chain, nylon web, or wire rope. Hitch and angle first, then size.
REDMC — RIGGING
BCACS Crane Core figures, March 2011. 3 sling charts. 0 questions. Training and assessment only — not a manufacturer rating for the lift.
Chain, nylon web, or wire rope. Hitch and angle first, then size.
2-leg choker × 0.75. Double basket × 2. Do not interpolate.
Exam figures. The sling tag and manufacturer chart win in the field.
In the bank